# INTERNAL WORK PACKAGE — INTAKE TEMPLATE
*The rows the planning system needs before a crew can be scheduled.*

One row per port. Every row carries the location fields.

| # | Field | Notes |
|---|---|---|
| 1 | Vendor | |
| 2 | Vendor reference | |
| 3 | Site address | |
| 4 | Survey date | |
| 5 | Requested completion | |
| 6 | Floor | |
| 7 | Room | |
| 8 | Port ID | one row each |
| 9 | Device type | from the controlled list: printer, workstation, AP, phone, other |
| 10 | Panel / termination | |
| 11 | Access constraint | |
| 12 | Power required | yes / no |
| 13 | Prerequisites | actions that must happen before the crew attends |
| 14 | Unconfirmed scope | anything the survey could not establish |

**Controlled list for field 9:** printer · workstation · AP · phone · other
